Photo: illustrative image created with AI.

Before an estimator drives, get the exact town, what the water or wall is doing, how urgent it is, who can approve the work and how you'll get in. Ask for photos if they're easy to send, and agree on the next step. Let the office book the clear fits. Send anything unclear, unsafe or outside the route to a named reviewer before it's declined or booked.

An inspection costs you a drive out, time in the basement and a drive back, whether or not you charge for it. During a thaw it also costs whichever basement you didn't get to. The aim of intake is to put that time where it belongs without turning a worried homeowner's phone call into an interrogation.

Write down what a good visit is

Do this before anyone writes questions. Pull last season's inspection requests, remove the names, and sort them into three piles: visits you'd make again, visits that should have been a phone call, and visits you shouldn't have made at all. Then write down what separates the piles at your company.

The line might be the work. If you install interior drainage, a gutter, grading or lone hairline-crack request may never justify a visit. It might be the road, if you'll go past the edge of your route for a foundation job and nothing smaller. Those rules are yours. Copying someone else's checklist gets you someone else's job mix.

If your notes are too thin to sort, start keeping them now and leave the tough rules for later.

The intake checklist

FieldHow to ask itNeeds staff review when
Service town"What's the street address, and which township is that?"It's at the edge of the route or the mailing name could mean two places
Problem"What are you seeing, and where in the basement?"They mention bowing, movement, a widening crack or something you don't offer
History"When does it happen, and has anyone worked on it?"It's your own past job, a warranty claim or a failed system by someone else
Urgency"Is water coming in now? Is it near anything electrical?"Always, if the answer to either is yes
Decision"Do you own the home? Will anyone else want to hear the explanation?"It's a tenant, a home sale, an association or a claim with an insurer
Access"Can we get to the walls? Parking, stairs, pets, anyone we should call first?"Walls are finished or packed, or there's no safe way in
Photos"If it's easy and safe, could you send a wide shot and a close one?"The photos don't match the description
Next step"Here's what happens now, and who'll call you."The office can't honestly finish that sentence
What the office asks, and when a person with trade knowledge steps in

Don't put all eight on a web form. The form needs contact details, address, a line about the problem and whether it's happening now. Ask the rest on a short call.

Take the town question seriously

Mailing addresses in this part of New Jersey are slippery. Landing is part of Roxbury, though a caller may name only one of them. A Morristown mailing address may be outside Morristown altogether. Get the street, put it on the map, and judge the drive from where the estimator will be that day.

And don't guess at the job from the town. A small house can need a full perimeter system. A large one can need a downspout extension you don't sell. Wait to hear the problem.

What do photos settle?

Less than you'd like. They're good for spotting the plainly wrong request: water under a kitchen sink, condensation on a cold pipe, a chimney leak that somebody described as a wet basement. They also tell the estimator what to bring and whether the wall is behind drywall.

They can't size a drain, clear a structural worry or show where water comes from in a storm that ended Tuesday. So the office shouldn't diagnose from them, and nobody should lose an inspection because they don't text pictures. Make photos optional, tell people not to go into water or move heavy things to take them, and keep them with the inquiry instead of on a crew phone.

Three answers the office can give

Book it

The town is on the route, the problem is work you do, someone who can decide will be there and there are no review flags. Confirm the time, who's coming, how long it takes and whether there's any charge.

Have the reviewer call

This is the pile people forget to build. Name one reviewer and a backup, and give the caller a time you can keep. The reviewer can book, ask for more, change the estimator or say no. Possible structural movement, active water near power, warranty history and big jobs just outside the area all land here. The office doesn't get to decline them alone. If the caller may be in danger, staff follow your emergency script first and leave the checklist for later.

Decline, kindly and early

Say what you don't do, in one sentence, and point somewhere useful if you honestly can:

"Thanks for explaining. We don't do gutter work, so I don't want to take up your afternoon with a visit for a job we can't take. For the gutter itself, a gutter company is the right call. If you still get water in the basement afterward, call us back and ask for me."

For distance, don't invent a busy schedule. "We don't send crews that far, and I'd rather tell you now than after you've waited for us" is enough.

Urgent doesn't always mean first

Someone with water coming in tonight may need a plumber, a restoration company or your emergency person, and may be in no position to discuss a permanent system until it's dry. Someone with a closing in ten days is urgent in a different way and may only want a number for negotiation. Both can be good customers. Record what's driving the urgency, then decide, so the loudest call doesn't take the only Saturday slot by default.

Ask about financing or budget carefully, if at all. Many homeowners won't know what this work costs, and a low first guess isn't proof of a bad lead. If you have a minimum job size, the reviewer can explain it plainly.

Check the rules against what happened

  1. Log every request, including the declines, with the reason.
  2. After each visit, the estimator marks it good, should have been a call, or wrong fit.
  3. Once a week, read the wrong fits and find the question that would have caught them.
  4. Once a month, read the declines too, and look for work you turned away by mistake.
  5. Change one rule at a time and note the date.

Count inspections that produced a written estimate, and the ones that were signed, out of all requests and out of all visits. Until you've got those numbers from before and after, don't tell yourself the checklist saved trips. The mix of requests may simply have changed. Once the estimate is out, the work changes to following up on it.

If the trouble is too few requests, stricter intake will make things worse. That's a planning job for winter, covered in getting waterproofing leads before the spring thaw. And if good requests die because nobody picks up, sort out missed calls before you add a single question.

Work it through with us

Our sales growth support reviews intake and recommends clearer questions and handoffs. Your team still takes the calls and makes the decisions. For a waterproofing or foundation company, bring a few weeks of inspection requests with names removed, your current form and your route, and request a free 20-minute growth conversation.